久久99久久99精品免观看,97视频免费看,97成人免费视频,亚洲综合丁香,第一福利视频网,视频福利网站,福利视频精品

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
Inspection and maintenance operations before and after the loader
Public date:2015-1-21   Hits:15322

Daily inspection and maintenance of pre-and post-job

Engine, electrical, instrumentation section

1.Check the water level in the tank。
2.Check the fuel oil tank。
3.Check the engine oil sump capacity。
4.Tightness check the tubing, pipes, pipe and various parts of the。
5.Check the battery terminal。

Chassis part

1.Check the hydraulic fluid amount of work。
2.Check the tightness of the hydraulic system piping and accessories。
3.Check the foot brake, hand brake work is reliable。
4.Check the joystick in the neutral position is flexible and。
5.Check the tire pressure (front: 0.30 ~ 0.32MPa, rear: 0.28 ~ 0.30MPa) is normal, tire bolts are loose, the locking force: 830N.m. Tire pressure must be controlled within the specified range, otherwise it would cause a major accident, such as a flat tire, causing casualties and losses。
6.Check before connecting the rear propeller shaft bolt is loose, shedding phenomenon, locking force: 130 ~ 215N.m。
7.Check the pin connecting bolt is loose。

Bolt locking force (unlabeled bolt grade 4.8)


Thread diametermm

6

8

10
(8.8Level)

12
(8.8Level)

14

16
(8.8Level)

18

20

22

24

27

30

36

TorqueN.m

4

9.5

48

86

51

220

112

160

220

280

410

550

970

8.Check the water level, the gearbox oil level, hydraulic oil, brake fluid (brake fluid) oil level [regular maintenance according to section 3.3], check for oil spills, leaks, air leaks。
9.Each nozzle grease filling (once a day, at least 3 to 4 times per week)。

Start the engine

1.Check the meter indication is normal。
2.Check the lighting equipment, horn, wiper, brake lights work。
3.Check the operation of the working device manipulation case。
4.Whether listening to the low-speed operation of the engine is working properly。
5.Engagement stall run。

 


Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
大同县| 英吉沙县| 共和县| 金华市| 洮南市| 改则县| 衡东县| 常宁市| 青海省| 五大连池市| 巴青县| 邯郸县| 嘉义市| 新河县| 文山县| 资源县| 图木舒克市| 石泉县| 襄汾县| 砀山县| 庆城县| 嘉黎县| 额济纳旗| 洞口县| 烟台市| 静海县| 沁阳市| 承德市| 湘乡市| 红原县| 米易县| 雅江县| 平利县| 临汾市| 神池县| 伊春市| 蓝山县| 宜黄县| 墨竹工卡县| 祁阳县| 吴旗县|